Arcelor Mittal

ZKS Ferrum in consortium with Primetals comprehensively carried out modernization and replacement of converter No. 1 Dąbrowski Branch of ArcelorMittal Poland. In the production plant in Katowice, steel structure totaling over 300 tons has been made. Then the old converter has benn replaced with a new converter with a cold start.

HKM Primetals

ZKS Ferrum made a convertor ring with a total weight of 210 tons for Primetals. The ring was made out of four elements at our plant in Katowice and then transported by road to Gdańsk. The elements of the ring were welded on the wharf, and then placed on the ship.

Siemens

Outer housing of the turbine.

Cordonnier

The base of the diffuser for the sugar industry.

Cemex

Segment of the furnace for the cement industry.

General Electric

Top Air generator housing.

Baterpol

Crucibles for lead refining.

PKN ORLEN

LPG Tanks, V=600m3

Cynkownia Radomsko

Galvanizing bath.

Bentec

System of tanks for shale gas extraction.

General Electric

Internal housing of the turbine.

Cemex

Drums for cement industry

Autoclaves for the production of aerated concrete

Drums

Rotary furnace

Scrubber.

Dryer

T-connector

Low pressure steam housing.

Dryer for cement plant.

Construction of welded shields.

Pipelines

Generator housing.

COS Elements

Piec cementowy.

Wanna cynkownicza.

Element rurociągu wody chłodzącej.

Montaż linii do produkcji rur spiralnie spawanych.

Thyssenkrupp – suszarnia obrotowa do produkcji rudy żelaza.